DATA CENTER VERIZON

Verizon Sylmar Evaporcool Measurement and Verification for project Verizon Wired, 14385 Polk Street, Sylmar, CA 91342 (Climate Zone 9): Through cooperation with Verizon Wired, Evaporcool and Los Angeles Department of Water and Power (LADPW), a standard M&V test was conducted on a Carrier 50EWQ24 (20 ton) unit serving the Sylmar location of Verizon Wired. The time period of this study was July 15, 2012 until October 30,2012. Pre-project readings were recorded for six weeks initially, and then post project readings were conducted for 8 weeks. The weather was measured on the roof by the unit and the power was measured by recording the power usage of the compressors and the entire unit separately; before and after the installation of the Evaporcool System.